HEADLINE: Supply and installation of a 140KWp Solar System at the UN House in Guinea-Bissau
Description: In a notable stride towards sustainability, the UN House in Bissau has embraced a 140 kWp solar installation, successfully completed in 2023. Designed to amplify the utilization of clean energy sources and minimize CO2 emissions, this solar plant stands as a beacon of environmental responsibility. As per the UNDP, this solar venture is projected to curtail approximately 61.42 tonnes of CO2 emissions annually, significantly lightening Guinea-Bissau’s carbon footprint and environmental impact.
Going beyond installation, JGH Solar conducted a training session for local end users, underscoring the commitment to efficient and informed system operation.
Details of the Project:
- Project: Solar Installation at the UN House in Bissau
- Client: UNDP
- Place: Bissau, Guinea-Bissau
- Status: Completed in 2023



